TUNNELLING JOURNAL FEBRUARY/MARCH
February/March 2026
The International Journal for the Tunnelling Industry
www.tunnellingjournal.com
2026
Precast Lining and Figure 4a, b, c: Surface Traverse
Vertical control network - A separate primary vertical control netwo
the LEM in Mined Tunnels
reliable elevation data for the project. This network consisted of 13 p
Points) and Temporary Control Points located along the road betwee
ground for stability and protection against erosion or surface disturba
Page Page Page
10
Segmental Linings
As single-pass
segmental linings are
asked to do
TUNNELLING JOURNAL FEBRUARY/MARCH February/March
2 Tunnelling Journal
5 1 7 10 11 4 8
Slurry T Smart Gripper Taihu Tunnel TBMinφ14.0
EDITOR’S COMMENT Innovation thrives - where Clie
BREAKING INDUSTRY NEWS COWI Wins Icelandic Infras
BREAKING INDUSTRY NEWS Hong Kong Invites Tenders
THE DIGITAL TUNNELLER Naomi Wheeler Reed, Associa
TECDOS LINEAR MOTION ROBUST , RELIABLE & STRONG
Segmental Linings As single-pass segmental lining
Segmental Linings CONVENTIONAL ANCHORING
The Doha South Sewer In
PATENTED HIGH-QUALITY GASKETS THAT ENSURE A LIFET
Cooper Turner Beck intrados
T2D in Adelaide and Vienna metro U2-17 have used
Precast Lining and the LEM in Mined Tunnels Sydn
Tunnelling Package (WTP), however, the need for a
ruled out the use of the traditional universal ri
TUNNELLING DIVISON Engineered Tunnel Segment G
Above from left to right: Figure 3: Inver
Precast Lining and the LEM in Mined Tunnels
A new technology for constructing Diaphragm Walls
A new technology for constructing Diaphragm Walls
Improving safety: From global standards down to a
Improving safety: From global standards down to a
Frida Isaksson, project manager, Epiroc sa
Improving safety: From global standards down to a
Dimensi ona G. Jagadeswara R Head of TBM Exc ass
Figure 2: Devprayag Portal Location The Package
iable elevation data for the project. This networ
Dimensional Control in the Himalayas
Upline Breakthrough Error Sr. No Tunnel Tun
VE TECHNICAL SESSIONS | GLOBAL INDUSTRY LEADERS
CONTACT US Tris Thomas Editorial Director Tel: +
YOUR TRUSTED PARTNER FOR INJECTION SOLUTIONS: WAT
February/March 2026 www.tunnellingjournal.
Above. Energy
Comment A Testament to tenacity This concluding i
4 North American Tunneling Journal Accepted.
NORTH AMERICAN NEWS Gateway sues the federal gove
NORTH AMERICAN NEWS TBM acceptance for Ellicott C
SAVE THE DATE 1,200+ ATTENDEES Conne
THE INSIDER Bob Goodfellow, PE, PEng, Senior Vice
Pioneering smarter underground solutions From con
Reaching new heights Work has completed on a 130-
existing groundwater, so to all that complexity w
Gantry assembly on site
Jacks support the tunnel walls as construction ad
and finished earlier than expected. That’s also co
Beneath the Surface, Beyond the Ordinary Tu
Tunnelling toward the future The Regional Municip
Tunnelling toward the future
Tunnel alignment Shaft excavation, No