If you are visually impaired or blind, you can visit the PDF version by Pressing CONTROL + ALT + 4
You need a JavaScript-enabled browser to view this Publication
Please follow these steps to view the Publication:
Enable JavaScript in your browser
Refresh this page
Best regards
Zmags
Issue No 6 November 2021
Journal of the Australian & New Zealand
Tunnelling Societies
1
COMBINED
SNOWY 2.0, NSW, AUSTRALIA
STRENGTH FOR
STEEP DEMANDS
The Snowy 2.0 project is the largest commitment to renewable energy
in Australia. Herrenknecht has delivered one Multi-mode TBM and a
Mixshield TBM (11.010 mm) both highly customized to the demands of
the project. The two machines will drill a total of 27 kilometers through
asbestos and from -6 to 25 degrees connecting two dams to a power
station, bringing renewable energy infrastructure to the next level.
herrenknecht.com/snowy
2
Client:
Snowy Hydro 2.0
Contractors:
Future Generation Joint
Venture
Contents november
ISSUE 6
07 PRESIDENT AN
Issue No 6 November 2021
COMBINED SNOWY 2.0, NSW, AUSTRALIA STRENGTH F
Contents november
PLATINUM SPONSORS John Holland Pty Ltd Contact: D
GOLD SUPPORTING MEMBERS GHD Pty Ltd Tel: 07 3316
Delivering Solutions with Integrity, Reliability
Cover photo: Cover photo: TBM ‘Else’ in the Wooll
Cross River Rail On the Cross River Rail Project
Snowy 2.0 starts Tunnelling at Snowy 2.0 has begu
Melbourne Metro The Metro Tunnel, previously know
ground level raising locally around the skylight,
Blue Mountains Tunnel Ambitious plans to build a
Western Sydney Airport Metro Gets Green Light Th
Metro West A $1.96bn contract has been awarded to
Westgate tunnel Melbourne’s long-delayed West Gat
Inland Rail update - July 2021 Inland Rail is Au
A proud supporter of the Australian Tunnelling So
Constructing our future together CPB Contractors
McConnell Dowell gets creative on NZ storage pipe
Auckland City Rail Link May 7th marked a mileston
Central Interceptor Watercare’s Central Intercep
Two more JIMT/TERRATEC EPBMs to Taoyuan MRT Green
80 acwhalan.com.au AC WHALAN AD TSUPNENCEIL
Mumbai Metro In Spring 2021, the second of two 6.
First tunnel breakthrough for Malaysia-China mega
Final Breakthrough on Bangkok Orange Line Contrac
100 years of experience combined with the most mo
LTA Awards CRL1 Ang Mo Kio Station And Tunnels S
ATS2020+1 Australasian Tunnelling Conference – a
willing to brave Melbourne in mid-May. The c
universities, more than a year ahead of the confe
QLD Chapter Report 3rd Qtr 2021 Diane Mat
VIC Chapter Report May to July 2021
ATS Young Members Q22021
AUSS (Shotcrete Society) Jan – Jul 2021
Austroads road tunnels project update Austroads’
Victorian Tunnelling Centre Tony Peglas
become involved in many of them, creating some fa
Fire Testing Workshop The Fire Testing Workshop w
American Rock Mechanics Association (ARMA) - Mona
The Australian Tunnelling Society would like to t
ATSym Report July 2021 | Brodie Aitchison | ATSym
ATS 2020+1 Conference - Young Members Networking
Australian and New Zealand Tunnel Projects Region
Scope of work
Contacts V7. ATS_1018_Contacts_050.qxd:Layout 1
Hardening post-crack behavior at a low total cost
Underground Engineering Excellence