If you are visually impaired or blind, you can visit the PDF version by Pressing CONTROL + ALT + 4
You need a JavaScript-enabled browser to view this Publication
Please follow these steps to view the Publication:
Enable JavaScript in your browser
Refresh this page
Best regards
Zmags
Issue No 15 April 2026
Melbourne Metro Tunnel
Project Opens
David Sugden Award
Winning Paper
Women in Tunnelling
Award - Kaylah Macintosh -
in Profile
Journal of the Australian & New Zealand
Tunnelling Societies
1
2
Contents April ISSUE15
04 SPONSORS
08 MELBOURNE’S METRO TUNNEL
10 AUSTRALIAN TUNNELLING
PROJECT NEWS
17 NEW ZEALAND TUNNELLING
PROJECT NEWS
20 ASIA TUNNELLING PROJECT
NEWS
22 MINING NEWS
13
24 DAVID SUGDEN AWARD WINNER
2025
32 INNOVATIVE PRODUCTS AND
SERVICES
33 INSPIRING AND EDUCATING
THE NEXT GENERATION OF
TUNNELLING SPECIALISTS
33
35 ATS CHAPTER AND SUBGROUP
REPORTS
38
Issue No 15 April 2026 Melbour
2
Contents April ISSUE15 04 SPONSO
PLATINUM SPONSORS John Holland Pty Ltd Contact: D
GOLD SUPPORTING MEMBERS Ghella Pty Ltd Tel: (02)
We keep your project rolling. Locomotives · R
Description: Stage 1 Vent Caverns - These caverns
Melbourne’s Metro Tunnel opens a new chapter for
Library precinct and the Queen Victoria Market. I
Two TBMs will launch from Burwood towards Glen Wa
ELEVATED THINKING, UNDERGROUND For 26 years Gall
Melbourne’s future engineers Melbourne’s future e
Plain Fault Zone. A T c t j t Ad
Looking ahead
well as train e^iciency. The project was upgraded
Khyber Pass Stormwater Upgrade March Cato has bee
The signature team DESIGN DELIVER INTEGRATE
Waitematā Harbour Connections New Zealand Transpo
World’s first in-situ diameter- adjustable tunnel
Bangkok MRT Purple Line TERRATEC’
Safe re-entry strategies at Grosvenor Mine: A com
David Sugden Award Winner 2025 What Lies Beneath
(2015), the formation of these vein stockworks is
depth are often massive to moderately jointed, th
CPB Contractors, Australia's specialist tunnellin
4.2. Calibration and Validation – Lab Scale Labor
failure mode classification used to inform shear
instability, and exaggerated dilation. The result
please visit https://tinyurl.com/367x93fk Howeve
SUBMIT TODAY! In this section, we share stories
Promat – Tunnel Lining Fire Protection: Why it Ma
deliver content while ensuring consistency and qu
ATC2025 brings the tunnelling community together
ATS Chapter and Subgroup Reports September 2025 –
• Temporary Works Forum Event – TBC • Fremantle P
IN PROFILE Kaylah Macintosh In this interview we
Steel fibre concrete reinforcement Dramix®
ATS News Introducing Wayne Leslie as the new Chai
Leading in real time Advancing sustainability in
In memorandum The ATS would like to deeply honour
Andrew “Lordy” Lord (1956 – 2025) Andrew was a ma
ITA World Tunnel Congress 2027 Antwerp UNDERGROUN
THE ANZ PHOTOGRAPHY COMPETITION Huge thanks to al
Historical Tunnelling Tunnel Boring at Australian
Concrete mould frame. Note the railway wheels sup
Australian and New Zealand Tunnel Projects Region
Scope of work
Contacts V7. ATS_1018_Contacts_050.qxd:Layout 1
51
Getting the job done. John Holland has been invol